Files
t3mp3st/.aiwg/architecture/adr-003.md
T
Joseph Magly b192577b54 docs(architecture): baseline current design (#109)
Capture the brownfield architecture and its relationship to the project vision.\n\n- add the current-state SAD and five retrospective ADRs\n- classify vision vectors against implementation evidence\n- record requirements, risks, gates, and construction handoff
2026-07-20 18:15:06 -04:00

639 B

ADR-003 — Enforce Scope and Approval Below Model Reasoning

Status: Accepted (retrospective)
Date: 2026-07-20

Context

Models and target content are nondeterministic and may suggest unsafe or off-scope actions. The arsenal performs real operations.

Decision

Target scope, egress containment, exact-origin credentials, and dangerous-tool approvals are enforced in deterministic target/arsenal/runtime paths, not solely in prompts.

Consequences

Prompt compromise does not automatically authorize execution. Every new network/tool adapter must carry and test these controls; bypasses are release-blocking defects.