Capture the brownfield architecture and its relationship to the project vision.\n\n- add the current-state SAD and five retrospective ADRs\n- classify vision vectors against implementation evidence\n- record requirements, risks, gates, and construction handoff
533 B
533 B
UC-003 — Operate Through Supported Surfaces
Primary actor: Operator or integrating client
Goal: Start and inspect capabilities through CLI, War Room/HTTP, library, or MCP.
Main Flow
- User selects an entry surface.
- Surface validates and translates input into shared domain operations.
- Shared mission, target, arsenal, and reporting services execute.
- Results return in surface-appropriate form.
Implementation coverage: src/cli.ts, src/server.ts, src/index.ts, src/mcp-server.ts, src/ui/.