Files
t3mp3st/.aiwg/planning/iteration-001-plan.md
T
Joseph Magly b192577b54 docs(architecture): baseline current design (#109)
Capture the brownfield architecture and its relationship to the project vision.\n\n- add the current-state SAD and five retrospective ADRs\n- classify vision vectors against implementation evidence\n- record requirements, risks, gates, and construction handoff
2026-07-20 18:15:06 -04:00

25 lines
1.3 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Iteration 001 Plan — Architecture Alignment
**Sprint goal:** Make current-state architecture and vision alignment maintainable, testable governance assets.
## Planned Work
1. Review and accept/amend SAD and ADR-001–005 with maintainers.
2. Reconcile canonical repository identity in package metadata and tracker configuration.
3. Add a documentation audit that detects stable/experimental/roadmap conflicts across README, FEATURES, SAD, and vision alignment.
4. Map each network-capable arsenal adapter to scope/approval tests.
5. Establish performance baselines for source ingestion and concurrent mission tasks.
6. Triage the 18 TODO/FIXME/HACK/XXX markers identified during intake.
## Definition of Done
- Maintainer decisions are reflected in accepted/superseded ADR status.
- CI or a documented release check validates maturity claim consistency.
- Safety-test coverage matrix has no unidentified network adapter.
- Baseline measurements include command, corpus, environment, and receipt.
- No roadmap capability is presented as current stable architecture.
## Dependencies and Risks
Owner validation is needed for repository identity and roadmap priority. Architecture documentation changes are non-runtime, but any resulting safety-control change requires the full security and claim gate suite.