Capture the brownfield architecture and its relationship to the project vision.\n\n- add the current-state SAD and five retrospective ADRs\n- classify vision vectors against implementation evidence\n- record requirements, risks, gates, and construction handoff
1.6 KiB
1.6 KiB
Initial Risk Screening
| ID | Risk | Severity | Evidence | Mitigation / control | Status |
|---|---|---|---|---|---|
| R-01 | Operations exceed authorized target scope | Critical | Real network/exploitation tools | Target scope model, egress containment, approvals, scope receipts | Controlled; continuous verification |
| R-02 | Secrets or engagement evidence leak | High | Provider keys, target headers, reports/evidence | Environment variables, target-origin binding, protected paths, local storage guidance | Open residual risk |
| R-03 | Aspirational capability is represented as shipped | High | Broad VISION.md; mixed maturity surface |
Status labels, claim verifier, vision-alignment matrix | Controlled; governance required |
| R-04 | Model/tool nondeterminism produces false findings | High | LLM and external-tool execution | Ground-truth grading, finding verification, refuter/provenance gates | Open residual risk |
| R-05 | External tools or dependencies compromise host/supply chain | High | Arsenal and container/tool installation | Narrow adapters, approval paths, pinned CI actions, isolated execution guidance | Open |
| R-06 | Modular monolith accumulates unsafe coupling | Medium | Broad src/ domain surface |
Module boundaries, SAD, ADRs, architecture checks | Open |
| R-07 | Local artifact loss or retention mishandling | Medium | Filesystem reports/evidence and browser localStorage | Protected update paths and operator procedures | Open |
No risk makes the documented current solution infeasible. R-01 is blocking for any release that weakens default containment without an approved replacement control.