# Construction Ready Brief
|
||
|
||
**Project:** T3MP3ST
|
||
**Date:** 2026-07-20
|
||
**Status:** CONSTRUCTION READY — brownfield architecture alignment
|
||
|
||
## Executive Summary
|
||
|
||
T3MP3ST is baselined as a local-first TypeScript modular monolith with CLI, library, localhost War Room/API, MCP, provider-neutral reasoning, mission/operator orchestration, deterministic target/arsenal safety controls, evidence/reporting, source analysis, and reproducible evaluation. The architecture documents what is implemented and explicitly refuses to equate `VISION.md` with current capability.
|
||
|
||
The highest-value construction work is architectural governance around existing code: validate the SAD/ADRs, automate maturity-claim consistency, complete the safety-test inventory for network adapters, and establish workload baselines. No rewrite or microservice migration is implied.
|
||
|
||
## Artifact Index
|
||
|
||
| Artifact | Status |
|
||
| --- | --- |
|
||
| Intake form, solution profile, option matrix, risk screening | Baselined |
|
||
| LOM gate | PASS |
|
||
| UC-001–UC-005, user stories, NFR register | Baselined |
|
||
| Current-state SAD | Baselined |
|
||
| ADR-001–ADR-005 | Accepted / retrospective |
|
||
| Vision-to-code alignment matrix | Baselined |
|
||
| Test strategy | Baselined |
|
||
| ABM gate | PASS |
|
||
| Iteration 001, team profile, CI/CD additions | Ready |
|
||
|
||
## Key Decisions
|
||
|
||
1. Retain a local-first modular monolith.
|
||
2. Keep reasoning provider-neutral and untrusted.
|
||
3. Enforce scope/approval beneath model reasoning.
|
||
4. Derive public claims from versioned evidence.
|
||
5. Separate implemented current state from research vision.
|
||
|
||
## Risks to Watch
|
||
|
||
Scope bypass, secret/evidence leakage, maturity overstatement, nondeterministic false findings, and external-tool supply-chain risk remain the leading concerns. See `intake/risk-screening.md` for controls and residual status.
|
||
|
||
## First Steps
|
||
|
||
1. Maintainers review the SAD and mark any ADR amended or superseded.
|
||
2. Execute Iteration 001 architecture-alignment work.
|
||
3. Preserve current CI gates while adding traceability/maturity checks.
|
||
4. Update the alignment matrix whenever a vision capability changes maturity.
|