Files
t3mp3st/.aiwg/reports/abm-gate-report.md
T
Joseph Magly afc9dad1b2 chore(aiwg): adopt shared BT6 maintainer workflow (#148)
* docs(policy): allow low-impact contributor courtesy cleanup

* chore(aiwg): migrate to shared BT6 maintainer plugin

* chore: reconcile delivery validation
2026-08-02 17:17:28 -04:00

43 lines
2.7 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Architecture Baseline Milestone Gate Report
## Gate Metadata
- **Decision:** PASS WITH CONDITIONS
- **Evaluation date:** 2026-07-21
- **Scope:** Current-state brownfield architecture and construction-readiness evidence
- **Evaluator:** Artifact standards audit; named maintainer approval pending
## Criteria and Evidence
| Criterion | Threshold | Status | Citable evidence |
| --- | --- | --- | --- |
| SAD completeness | v3 sections, context/container/component/data/sequences/API/deployment/cross-cutting/technology/traceability/open questions | PASS | Software Architecture Document |
| Architectural decisions | At least three decisions with context, alternatives, consequences, risks, implementation/tests, references | PASS | ADR-001 through ADR-005 |
| Requirement architecture coverage | Every UC, story group, and NFR maps to a component/tactic and verification | PASS | SAD §§12–14 |
| Test strategy | Levels, environments, metrics, risk mapping, and blocking gates are explicit | PASS | Test strategy |
| Risk control | No accepted release path weakens blocking safety controls | PASS | R-001/R-002/R-008; ADR-003 |
| Vision/current-state separation | Maturity evidence and promotion gates are explicit | PASS | ADR-005 and vision alignment |
| Review approval | Named architecture/safety/evaluation approval recorded | CONDITION | Roles defined; named sign-off pending |
| Open architecture work | Gaps have owners/target phase and do not masquerade as implemented claims | PASS | SAD Appendix B; Iteration 001 |
## Conditions
1. Maintainers must review the SAD/ADRs and record named accept/amend/supersede outcomes.
2. Complete the adapter safety inventory and maturity-consistency automation before claiming those controls are complete.
3. Establish measured workload/startup/shutdown baselines before making performance or disposability claims.
## Decision Rationale
The current-state architecture is sufficiently detailed and traceable for controlled brownfield construction. “Pass” does not promote experimental features, prove hosted-service readiness, or fabricate stakeholder approval. The conditions are explicit construction work and release-review prerequisites where applicable.
## References
- @.aiwg/architecture/software-architecture-doc.md — Architecture baseline and matrices.
- @.aiwg/architecture/adr-001.md — Local-first modular structure.
- @.aiwg/architecture/adr-003.md — Deterministic safety boundary.
- @.aiwg/architecture/adr-005.md — Maturity boundary.
- @.aiwg/architecture/vision-alignment.md — Evidence and promotion criteria.
- @.aiwg/testing/test-strategy.md — Verification strategy.
- @.aiwg/planning/iteration-001-plan.md — Condition closure plan.
- @.aiwg/team/team-profile.md — Pending named ownership.