Architecture Baseline Milestone Gate Report

Gate Metadata

  • Decision: PASS WITH CONDITIONS
  • Evaluation date: 2026-07-21
  • Scope: Current-state brownfield architecture and construction-readiness evidence
  • Evaluator: Artifact standards audit; named maintainer approval pending

Criteria and Evidence

Criterion Threshold Status Citable evidence
SAD completeness v3 sections, context/container/component/data/sequences/API/deployment/cross-cutting/technology/traceability/open questions PASS Software Architecture Document
Architectural decisions At least three decisions with context, alternatives, consequences, risks, implementation/tests, references PASS ADR-001 through ADR-005
Requirement architecture coverage Every UC, story group, and NFR maps to a component/tactic and verification PASS SAD §§12–14
Test strategy Levels, environments, metrics, risk mapping, and blocking gates are explicit PASS Test strategy
Risk control No accepted release path weakens blocking safety controls PASS R-001/R-002/R-008; ADR-003
Vision/current-state separation Maturity evidence and promotion gates are explicit PASS ADR-005 and vision alignment
Review approval Named architecture/safety/evaluation approval recorded CONDITION Roles defined; named sign-off pending
Open architecture work Gaps have owners/target phase and do not masquerade as implemented claims PASS SAD Appendix B; Iteration 001

Conditions

  1. Maintainers must review the SAD/ADRs and record named accept/amend/supersede outcomes.
  2. Complete the adapter safety inventory and maturity-consistency automation before claiming those controls are complete.
  3. Establish measured workload/startup/shutdown baselines before making performance or disposability claims.

Decision Rationale

The current-state architecture is sufficiently detailed and traceable for controlled brownfield construction. “Pass” does not promote experimental features, prove hosted-service readiness, or fabricate stakeholder approval. The conditions are explicit construction work and release-review prerequisites where applicable.

References

  • @.aiwg/architecture/software-architecture-doc.md — Architecture baseline and matrices.
  • @.aiwg/architecture/adr-001.md — Local-first modular structure.
  • @.aiwg/architecture/adr-003.md — Deterministic safety boundary.
  • @.aiwg/architecture/adr-005.md — Maturity boundary.
  • @.aiwg/architecture/vision-alignment.md — Evidence and promotion criteria.
  • @.aiwg/testing/test-strategy.md — Verification strategy.
  • @.aiwg/planning/iteration-001-plan.md — Condition closure plan.
  • @.aiwg/team/team-profile.md — Pending named ownership.