Capture the brownfield architecture and its relationship to the project vision.\n\n- add the current-state SAD and five retrospective ADRs\n- classify vision vectors against implementation evidence\n- record requirements, risks, gates, and construction handoff
16 lines
894 B
Markdown
16 lines
894 B
Markdown
# Architecture Baseline Milestone Gate Report
|
|
|
|
**Status:** PASS
|
|
**Date:** 2026-07-20
|
|
|
|
| Criterion | Status | Evidence |
|
|
| --- | --- | --- |
|
|
| SAD exists and is baselined | PASS | `architecture/software-architecture-doc.md`; current-state, >1,000 words |
|
|
| At least three ADRs | PASS | ADR-001 through ADR-005 |
|
|
| Use-case architectural coverage | PASS | SAD traceability covers UC-001 through UC-005 |
|
|
| Test strategy exists | PASS | `testing/test-strategy.md` |
|
|
| No unmitigated blocking architecture risk | PASS | R-01 has enforced controls; weakening them is explicitly release-blocking |
|
|
| Vision/current-state separation | PASS | ADR-005 and `architecture/vision-alignment.md` |
|
|
|
|
The architecture is baselined for maintenance and controlled evolution. “Construction ready” means the brownfield team can prioritize alignment work; it does not relabel experimental features as stable.
|