name, description
| name |
description |
| bt6-merge-train-report |
BT6 merge-session report with authorization, exact per-PR gates, research integrity, merge results, issue reconciliation, and stop reasons. |
BT6 Merge Train Report
Date: <YYYY-MM-DD HH:MM timezone>
Repository: <canonical repository>
Tracker: <canonical tracker>
Actor: <maintainer login>
Base branch: <branch>
Mode: <dry-run/live>
Authorization and Policy
- Authorization source/scope:
<operator request or dry-run only>
- Queue audit:
<date/link/commit>
- Allowed/default merge method:
<methods>/<default>
- Required checks policy:
<summary>
- Local worktree state:
<clean/dirty and relevance>
- Hostile-input preflight:
<current/missing>
- External-provider assessments:
<current for applicable candidates | missing/stale for PR #>
Candidate Gates
| Order |
PR |
Audited SHA |
Current SHA |
Mergeable |
Reviews |
Required Checks |
Risk-surface Checks |
Decision |
| 1 |
<#> |
<sha> |
<sha> |
<state> |
<state> |
<pass/fail> |
<pass/fail/evidence> |
<merge/hold> |
Merged
| PR |
Head SHA |
Result Commit |
Method |
Post-merge CI |
Linked Issues |
Outcome |
<#> |
<sha> |
<sha> |
<method> |
<pass/pending/fail> |
<issues> |
<observed outcome> |
Research / Data Integrity Verification
| PR |
Provenance / Citation |
Corpus / Schema |
Reproducibility |
Evidence |
<#> |
<pass/n-a> |
<pass/n-a> |
<pass/n-a> |
<checks/artifacts> |
Stopped Before
| PR |
Stop Reason |
Required Follow-up |
<#> |
<exact reason> |
<follow-up> |
Issue Reconciliation
| Issue |
Expected Outcome |
Observed Outcome |
Authorized Action Taken |
<#> |
<close/comment/remain> |
<actual> |
<none/action> |
Refreshed Queue / Next Candidate
- Base branch after last action:
<sha>
- Queue refresh time:
<time>
- Next candidate:
<# or none>
- Reason and required rechecks:
<details>