Files
Joseph Magly afc9dad1b2 chore(aiwg): adopt shared BT6 maintainer workflow (#148)
* docs(policy): allow low-impact contributor courtesy cleanup

* chore(aiwg): migrate to shared BT6 maintainer plugin

* chore: reconcile delivery validation
2026-08-02 17:17:28 -04:00

39 lines
2.3 KiB
Markdown
Raw Permalink Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Lifecycle Objective Milestone Gate Report
## Gate Metadata
- **Decision:** PASS WITH CONDITIONS
- **Evaluation date:** 2026-07-21
- **Scope:** Brownfield lifecycle objectives, owner context, initial risk, and solution viability
- **Evaluator:** Artifact standards audit; named maintainer approval pending
## Criteria and Evidence
| Criterion | Threshold | Status | Citable evidence |
| --- | --- | --- | --- |
| Problem and outcomes | Problem, stakeholders, scope, measurable success criteria | PASS | Intake form and project intake |
| Owner intent | Priority, scale context, failure posture, commitments recorded | PASS | Option matrix owner answers and decision record |
| Initial risk | Impact/likelihood/exposure/owner/status/residual risk for critical domains | PASS | Risk register R-001–R-010 |
| Quality constraints | Critical NFRs are measurable with repeatable verification | PASS | NFR-01–NFR-12 register |
| Solution viability | Implemented brownfield path exists; no infeasible constraint identified | PASS | Codebase report, SAD, current CI |
| Ownership | Named owners/reviewers assigned | CONDITION | Roles defined, assignments pending |
## Conditions and Residual Uncertainty
1. Assign named architecture, safety, evaluation, test, and release owners before a release/maturity decision relies on role approval.
2. Treat the thousands-to-tens-of-thousands scale as owner-supplied planning context, not measured telemetry.
3. Do not infer hosted SLOs, general support commitments, or certification from the current local/open-source baseline.
## Decision Rationale
The gate authorizes brownfield elaboration/construction-alignment work because the problem, current solution, success criteria, risks, owner intent, and critical quality constraints are explicit. The ownership condition affects review evidence but does not prevent documenting or testing the implemented baseline.
## References
- @.aiwg/intake/intake-form.md — Concise objective and owner context.
- @.aiwg/intake/project-intake.md — Detailed brownfield baseline.
- @.aiwg/intake/option-matrix.md — Owner answers and trade-offs.
- @.aiwg/intake/risk-screening.md — Prioritized risks.
- @.aiwg/requirements/nfr-register.md — Measurable constraints.
- @.aiwg/team/team-profile.md — Pending role assignment.