docs(architecture): baseline current design (#109)

Capture the brownfield architecture and its relationship to the project vision.\n\n- add the current-state SAD and five retrospective ADRs\n- classify vision vectors against implementation evidence\n- record requirements, risks, gates, and construction handoff
This commit is contained in:
Joseph Magly authored and GitHub committed 2026-07-20 18:15:06 -04:00
1 parent 937c6e9837
commit b192577b54
28 files changed
+1076

No files matched your search

+15
View File
@@ -0,0 +1,15 @@
# Architecture Baseline Milestone Gate Report
**Status:** PASS
**Date:** 2026-07-20
| Criterion | Status | Evidence |
| --- | --- | --- |
| SAD exists and is baselined | PASS | `architecture/software-architecture-doc.md`; current-state, >1,000 words |
| At least three ADRs | PASS | ADR-001 through ADR-005 |
| Use-case architectural coverage | PASS | SAD traceability covers UC-001 through UC-005 |
| Test strategy exists | PASS | `testing/test-strategy.md` |
| No unmitigated blocking architecture risk | PASS | R-01 has enforced controls; weakening them is explicitly release-blocking |
| Vision/current-state separation | PASS | ADR-005 and `architecture/vision-alignment.md` |
The architecture is baselined for maintenance and controlled evolution. “Construction ready” means the brownfield team can prioritize alignment work; it does not relabel experimental features as stable.
+44
View File
@@ -0,0 +1,44 @@
# Construction Ready Brief
**Project:** T3MP3ST
**Date:** 2026-07-20
**Status:** CONSTRUCTION READY — brownfield architecture alignment
## Executive Summary
T3MP3ST is baselined as a local-first TypeScript modular monolith with CLI, library, localhost War Room/API, MCP, provider-neutral reasoning, mission/operator orchestration, deterministic target/arsenal safety controls, evidence/reporting, source analysis, and reproducible evaluation. The architecture documents what is implemented and explicitly refuses to equate `VISION.md` with current capability.
The highest-value construction work is architectural governance around existing code: validate the SAD/ADRs, automate maturity-claim consistency, complete the safety-test inventory for network adapters, and establish workload baselines. No rewrite or microservice migration is implied.
## Artifact Index
| Artifact | Status |
| --- | --- |
| Intake form, solution profile, option matrix, risk screening | Baselined |
| LOM gate | PASS |
| UC-001–UC-005, user stories, NFR register | Baselined |
| Current-state SAD | Baselined |
| ADR-001–ADR-005 | Accepted / retrospective |
| Vision-to-code alignment matrix | Baselined |
| Test strategy | Baselined |
| ABM gate | PASS |
| Iteration 001, team profile, CI/CD additions | Ready |
## Key Decisions
1. Retain a local-first modular monolith.
2. Keep reasoning provider-neutral and untrusted.
3. Enforce scope/approval beneath model reasoning.
4. Derive public claims from versioned evidence.
5. Separate implemented current state from research vision.
## Risks to Watch
Scope bypass, secret/evidence leakage, maturity overstatement, nondeterministic false findings, and external-tool supply-chain risk remain the leading concerns. See `intake/risk-screening.md` for controls and residual status.
## First Steps
1. Maintainers review the SAD and mark any ADR amended or superseded.
2. Execute Iteration 001 architecture-alignment work.
3. Preserve current CI gates while adding traceability/maturity checks.
4. Update the alignment matrix whenever a vision capability changes maturity.
+14
View File
@@ -0,0 +1,14 @@
# Lifecycle Objective Milestone Gate Report
**Status:** PASS
**Date:** 2026-07-20
| Criterion | Status | Evidence |
| --- | --- | --- |
| Problem statement defined | PASS | `intake/intake-form.md` |
| Success metrics defined | PASS | Five measurable criteria in intake |
| Stakeholders identified | PASS | Five stakeholder groups in intake |
| Initial risk screening complete | PASS | Seven risks in `intake/risk-screening.md` |
| Solution approach viable | PASS | Existing operational codebase; no infeasible constraint |
The gate authorizes brownfield elaboration. Unknown adoption, staffing, and SLO facts remain owner inputs but do not prevent documenting current architecture.