Files
t3mp3st/.aiwg/reports/abm-gate-report.md
T
Joseph Magly b192577b54 docs(architecture): baseline current design (#109)
Capture the brownfield architecture and its relationship to the project vision.\n\n- add the current-state SAD and five retrospective ADRs\n- classify vision vectors against implementation evidence\n- record requirements, risks, gates, and construction handoff
2026-07-20 18:15:06 -04:00

894 B

Architecture Baseline Milestone Gate Report

Status: PASS
Date: 2026-07-20

Criterion Status Evidence
SAD exists and is baselined PASS architecture/software-architecture-doc.md; current-state, >1,000 words
At least three ADRs PASS ADR-001 through ADR-005
Use-case architectural coverage PASS SAD traceability covers UC-001 through UC-005
Test strategy exists PASS testing/test-strategy.md
No unmitigated blocking architecture risk PASS R-01 has enforced controls; weakening them is explicitly release-blocking
Vision/current-state separation PASS ADR-005 and architecture/vision-alignment.md

The architecture is baselined for maintenance and controlled evolution. “Construction ready” means the brownfield team can prioritize alignment work; it does not relabel experimental features as stable.