Architecture Baseline Milestone Gate Report
Status: PASS
Date: 2026-07-20
| Criterion | Status | Evidence |
|---|---|---|
| SAD exists and is baselined | PASS | architecture/software-architecture-doc.md; current-state, >1,000 words |
| At least three ADRs | PASS | ADR-001 through ADR-005 |
| Use-case architectural coverage | PASS | SAD traceability covers UC-001 through UC-005 |
| Test strategy exists | PASS | testing/test-strategy.md |
| No unmitigated blocking architecture risk | PASS | R-01 has enforced controls; weakening them is explicitly release-blocking |
| Vision/current-state separation | PASS | ADR-005 and architecture/vision-alignment.md |
The architecture is baselined for maintenance and controlled evolution. “Construction ready” means the brownfield team can prioritize alignment work; it does not relabel experimental features as stable.