Files
t3mp3st/.aiwg/intake/risk-screening.md
T
Joseph Magly b192577b54 docs(architecture): baseline current design (#109)
Capture the brownfield architecture and its relationship to the project vision.\n\n- add the current-state SAD and five retrospective ADRs\n- classify vision vectors against implementation evidence\n- record requirements, risks, gates, and construction handoff
2026-07-20 18:15:06 -04:00

1.6 KiB

Initial Risk Screening

ID Risk Severity Evidence Mitigation / control Status
R-01 Operations exceed authorized target scope Critical Real network/exploitation tools Target scope model, egress containment, approvals, scope receipts Controlled; continuous verification
R-02 Secrets or engagement evidence leak High Provider keys, target headers, reports/evidence Environment variables, target-origin binding, protected paths, local storage guidance Open residual risk
R-03 Aspirational capability is represented as shipped High Broad VISION.md; mixed maturity surface Status labels, claim verifier, vision-alignment matrix Controlled; governance required
R-04 Model/tool nondeterminism produces false findings High LLM and external-tool execution Ground-truth grading, finding verification, refuter/provenance gates Open residual risk
R-05 External tools or dependencies compromise host/supply chain High Arsenal and container/tool installation Narrow adapters, approval paths, pinned CI actions, isolated execution guidance Open
R-06 Modular monolith accumulates unsafe coupling Medium Broad src/ domain surface Module boundaries, SAD, ADRs, architecture checks Open
R-07 Local artifact loss or retention mishandling Medium Filesystem reports/evidence and browser localStorage Protected update paths and operator procedures Open

No risk makes the documented current solution infeasible. R-01 is blocking for any release that weakens default containment without an approved replacement control.