Files
t3mp3st/.aiwg/reports/construction-ready-brief.md
T
Joseph Magly b192577b54 docs(architecture): baseline current design (#109)
Capture the brownfield architecture and its relationship to the project vision.\n\n- add the current-state SAD and five retrospective ADRs\n- classify vision vectors against implementation evidence\n- record requirements, risks, gates, and construction handoff
2026-07-20 18:15:06 -04:00

2.1 KiB
Raw Blame History

Construction Ready Brief

Project: T3MP3ST
Date: 2026-07-20
Status: CONSTRUCTION READY — brownfield architecture alignment

Executive Summary

T3MP3ST is baselined as a local-first TypeScript modular monolith with CLI, library, localhost War Room/API, MCP, provider-neutral reasoning, mission/operator orchestration, deterministic target/arsenal safety controls, evidence/reporting, source analysis, and reproducible evaluation. The architecture documents what is implemented and explicitly refuses to equate VISION.md with current capability.

The highest-value construction work is architectural governance around existing code: validate the SAD/ADRs, automate maturity-claim consistency, complete the safety-test inventory for network adapters, and establish workload baselines. No rewrite or microservice migration is implied.

Artifact Index

Artifact Status
Intake form, solution profile, option matrix, risk screening Baselined
LOM gate PASS
UC-001–UC-005, user stories, NFR register Baselined
Current-state SAD Baselined
ADR-001–ADR-005 Accepted / retrospective
Vision-to-code alignment matrix Baselined
Test strategy Baselined
ABM gate PASS
Iteration 001, team profile, CI/CD additions Ready

Key Decisions

  1. Retain a local-first modular monolith.
  2. Keep reasoning provider-neutral and untrusted.
  3. Enforce scope/approval beneath model reasoning.
  4. Derive public claims from versioned evidence.
  5. Separate implemented current state from research vision.

Risks to Watch

Scope bypass, secret/evidence leakage, maturity overstatement, nondeterministic false findings, and external-tool supply-chain risk remain the leading concerns. See intake/risk-screening.md for controls and residual status.

First Steps

  1. Maintainers review the SAD and mark any ADR amended or superseded.
  2. Execute Iteration 001 architecture-alignment work.
  3. Preserve current CI gates while adding traceability/maturity checks.
  4. Update the alignment matrix whenever a vision capability changes maturity.