# Construction Ready Brief **Project:** T3MP3ST **Date:** 2026-07-20 **Status:** CONDITIONALLY CONSTRUCTION READY — brownfield architecture alignment ## Executive Summary T3MP3ST is baselined as a local-first TypeScript modular monolith with CLI, library, localhost War Room/API, MCP, provider-neutral reasoning, mission/operator orchestration, deterministic target/arsenal safety controls, evidence/reporting, source analysis, and reproducible evaluation. The architecture documents what is implemented and explicitly refuses to equate `VISION.md` with current capability. The highest-value construction work is architectural governance around existing code: validate the SAD/ADRs, automate maturity-claim consistency, complete the safety-test inventory for network adapters, and establish workload baselines. No rewrite or microservice migration is implied. ## Artifact Index | Artifact | Status | | --- | --- | | Intake form, solution profile, option matrix, risk screening | Baselined | | LOM gate | PASS | | UC-001–UC-005, user stories, NFR register | Baselined | | Current-state SAD | Baselined | | ADR-001–ADR-005 | Accepted / retrospective | | Vision-to-code alignment matrix | Baselined | | Test strategy | Baselined | | ABM gate | PASS | | Iteration 001, team profile, CI/CD additions | Ready | ## Key Decisions 1. Retain a local-first modular monolith. 2. Keep reasoning provider-neutral and untrusted. 3. Enforce scope/approval beneath model reasoning. 4. Derive public claims from versioned evidence. 5. Separate implemented current state from research vision. ## Risks to Watch Scope bypass, secret/evidence leakage, maturity overstatement, nondeterministic false findings, and external-tool supply-chain risk remain the leading concerns. See `intake/risk-screening.md` for controls and residual status. ## First Steps 1. Maintainers review the SAD and mark any ADR amended or superseded. 2. Execute Iteration 001 architecture-alignment work. 3. Preserve current CI gates while adding traceability/maturity checks. 4. Update the alignment matrix whenever a vision capability changes maturity. ## Readiness Conditions - Named maintainers must review and record accept/amend/supersede outcomes for the SAD and ADRs. - The adapter safety inventory, maturity consistency audit, and workload baselines remain Iteration 001 work; they are not described as complete controls. - Any implementation change follows the test and deployment gates; documentation-only readiness does not waive runtime verification. ## References - @.aiwg/reports/lom-gate-report.md — Lifecycle objective gate and conditions. - @.aiwg/reports/abm-gate-report.md — Architecture baseline gate and conditions. - @.aiwg/architecture/software-architecture-doc.md — Current architecture baseline. - @.aiwg/architecture/vision-alignment.md — Maturity evidence. - @.aiwg/requirements/nfr-register.md — Quality constraints. - @.aiwg/testing/test-strategy.md — Construction/release verification. - @.aiwg/planning/iteration-001-plan.md — First construction-alignment iteration. - @.aiwg/intake/risk-screening.md — Residual risks.