# Architecture Baseline Milestone Gate Report ## Gate Metadata - **Decision:** PASS WITH CONDITIONS - **Evaluation date:** 2026-07-21 - **Scope:** Current-state brownfield architecture and construction-readiness evidence - **Evaluator:** Artifact standards audit; named maintainer approval pending ## Criteria and Evidence | Criterion | Threshold | Status | Citable evidence | | --- | --- | --- | --- | | SAD completeness | v3 sections, context/container/component/data/sequences/API/deployment/cross-cutting/technology/traceability/open questions | PASS | Software Architecture Document | | Architectural decisions | At least three decisions with context, alternatives, consequences, risks, implementation/tests, references | PASS | ADR-001 through ADR-005 | | Requirement architecture coverage | Every UC, story group, and NFR maps to a component/tactic and verification | PASS | SAD §§12–14 | | Test strategy | Levels, environments, metrics, risk mapping, and blocking gates are explicit | PASS | Test strategy | | Risk control | No accepted release path weakens blocking safety controls | PASS | R-001/R-002/R-008; ADR-003 | | Vision/current-state separation | Maturity evidence and promotion gates are explicit | PASS | ADR-005 and vision alignment | | Review approval | Named architecture/safety/evaluation approval recorded | CONDITION | Roles defined; named sign-off pending | | Open architecture work | Gaps have owners/target phase and do not masquerade as implemented claims | PASS | SAD Appendix B; Iteration 001 | ## Conditions 1. Maintainers must review the SAD/ADRs and record named accept/amend/supersede outcomes. 2. Complete the adapter safety inventory and maturity-consistency automation before claiming those controls are complete. 3. Establish measured workload/startup/shutdown baselines before making performance or disposability claims. ## Decision Rationale The current-state architecture is sufficiently detailed and traceable for controlled brownfield construction. “Pass” does not promote experimental features, prove hosted-service readiness, or fabricate stakeholder approval. The conditions are explicit construction work and release-review prerequisites where applicable. ## References - @.aiwg/architecture/software-architecture-doc.md — Architecture baseline and matrices. - @.aiwg/architecture/adr-001.md — Local-first modular structure. - @.aiwg/architecture/adr-003.md — Deterministic safety boundary. - @.aiwg/architecture/adr-005.md — Maturity boundary. - @.aiwg/architecture/vision-alignment.md — Evidence and promotion criteria. - @.aiwg/testing/test-strategy.md — Verification strategy. - @.aiwg/planning/iteration-001-plan.md — Condition closure plan. - @.aiwg/team/team-profile.md — Pending named ownership.