chore(aiwg): adopt shared BT6 maintainer workflow (#148)

* docs(policy): allow low-impact contributor courtesy cleanup

* chore(aiwg): migrate to shared BT6 maintainer plugin

* chore: reconcile delivery validation
This commit is contained in:
Joseph Magly authored and GitHub committed 2026-08-02 17:17:28 -04:00
1 parent 8f658891f2
commit afc9dad1b2
89 files changed
+4683 -1512

No files matched your search

+20 -3
View File
@@ -1,8 +1,8 @@
# Construction Ready Brief
**Project:** T3MP3ST
**Date:** 2026-07-20
**Status:** CONSTRUCTION READY — brownfield architecture alignment
**Project:** T3MP3ST
**Date:** 2026-07-20
**Status:** CONDITIONALLY CONSTRUCTION READY — brownfield architecture alignment
## Executive Summary
@@ -42,3 +42,20 @@ Scope bypass, secret/evidence leakage, maturity overstatement, nondeterministic
2. Execute Iteration 001 architecture-alignment work.
3. Preserve current CI gates while adding traceability/maturity checks.
4. Update the alignment matrix whenever a vision capability changes maturity.
## Readiness Conditions
- Named maintainers must review and record accept/amend/supersede outcomes for the SAD and ADRs.
- The adapter safety inventory, maturity consistency audit, and workload baselines remain Iteration 001 work; they are not described as complete controls.
- Any implementation change follows the test and deployment gates; documentation-only readiness does not waive runtime verification.
## References
- @.aiwg/reports/lom-gate-report.md — Lifecycle objective gate and conditions.
- @.aiwg/reports/abm-gate-report.md — Architecture baseline gate and conditions.
- @.aiwg/architecture/software-architecture-doc.md — Current architecture baseline.
- @.aiwg/architecture/vision-alignment.md — Maturity evidence.
- @.aiwg/requirements/nfr-register.md — Quality constraints.
- @.aiwg/testing/test-strategy.md — Construction/release verification.
- @.aiwg/planning/iteration-001-plan.md — First construction-alignment iteration.
- @.aiwg/intake/risk-screening.md — Residual risks.